Friday, 9 November 2012

Oct 4th - brickwork forging ahead

Subtle old detail restored into new wall

Pillars and doors and window openings where they were before



gold brick detail goes in too


2nd Oct Power goes in

trench dug for 3 phase power

British Gas dig and insert power

Brickwork continues

28th Sep

New wall going up!

Dampcourse in - lots of rain

Friday, 14 September 2012

12th Sep - Concrete floors laid!

Poured concrete floors of workshop/ working space

Frazer demonstrating how the surviving wall falls apart by touching!



10th Sep - Drainage

Drainage going in for workshop

7th Sep Foundations

Foundations starting!

Blocks being laid with cavity - we loose 100mm around inside of  these rooms due to having to fit in with regulations of a newbuild! Shame.


4th September - Skip day!

A lot of soil and hardcore to remove before foundations go in

Hole being made where doorway through to garden will be

Chimney being re-built! Yey!

Frazer making room for skip

Fireplace revealed in gallery

12 skip loads!