The Bower House Gallery Renovation
Friday, 9 November 2012
Oct 4th - brickwork forging ahead
Subtle old detail restored into new wall
Pillars and doors and window openings where they were before
gold brick detail goes in too
2nd Oct Power goes in
trench dug for 3 phase power
British Gas dig and insert power
Brickwork continues
28th Sep
New wall going up!
Dampcourse in - lots of rain
Friday, 14 September 2012
12th Sep - Concrete floors laid!
Poured concrete floors of workshop/ working space
Frazer demonstrating how the surviving wall falls apart by touching!
10th Sep - Drainage
Drainage going in for workshop
7th Sep Foundations
Foundations starting!
Blocks being laid with cavity - we loose 100mm around inside of these rooms due to having to fit in with regulations of a newbuild! Shame.
4th September - Skip day!
A lot of soil and hardcore to remove before foundations go in
Hole being made where doorway through to garden will be
Chimney being re-built! Yey!
Frazer making room for skip
Fireplace revealed in gallery
12 skip loads!
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)